WBM Correction Work
Discuss Water Bound Macadam correction requirements, including the specified thickness and extent of work.
Discuss pavement correction, bituminous surfacing, surface preparation, and road marking requirements for your construction scope.
Pavement work brings together preparation, specified materials, layer thicknesses, and compaction requirements. Each enquiry should identify the existing road conditions and the proposed construction scope.
Share your road surfacing requirements with TDA INFRACON to discuss the work limits, technical documents, resources, and coordination arrangements.
Representative stock photograph.
These activities appear in the supplied road work description and provide a basis for discussing project-specific requirements.
Discuss Water Bound Macadam correction requirements, including the specified thickness and extent of work.
Review the specified DBM layer, material requirements, quantities, and construction arrangements.
Discuss the proposed BC surfacing layer and the thickness and finishing requirements in the project scope.
Review the surface treatment requirements specified for the pavement construction package.
Define the laying, equipment, and compaction requirements alongside the project specifications.
Discuss marking layouts, quantities, and thermoplastic paint requirements for the defined scope.
The supplied work description concerns surfacing for improvement of riding quality on Anini–Mipi Road under Project Udayak in Arunachal Pradesh.
Sections: km 2.000–14.000, km 16.380–16.653,
and km 19.917–21.024.
Units referenced: 62 RCC under 752 BRTF, Project Udayak.
Clear technical and site information helps define the discussion and identify the documents needed to assess the proposed work.
Road name, chainage, access information, and available details of the existing surface.
Proposed pavement layers, thicknesses, materials, drawings, and applicable specifications.
Length, width, layer quantities, treatment areas, and marking requirements.
Proposed programme, site arrangements, work responsibilities, and commercial expectations.
A few useful points before discussing your surfacing and pavement requirements.
You can share requirements for WBM correction, DBM and BC layers, prime coat, tack coat, laying and compaction, and thermoplastic road markings. Project suitability and responsibilities should be discussed with the team.
DBM means Dense Bituminous Macadam. BC means Bituminous Concrete. Both terms appear in the supplied road surfacing description.
No. The thicknesses shown here belong to the supplied Anini–Mipi scope. Your project requirements must follow its approved design and specifications.
Share available drawings, pavement specifications, quantities, work limits, road condition information, and the proposed construction programme.
The page uses representative stock photography. Actual project images can replace them when available.
Share your project location, technical scope, and construction requirements with TDA INFRACON.
P No. 43 A/5, Flat AR No. 2C,
T S 8814, Vadawali Sect,
Ambernath, Maharashtra – 421501.
Call: +91 98107 76177
TDA INFRACON provides road construction, pavement works, building and civil construction, and construction subcontracting services.
© 2026 TDA INFRACON. All Rights Reserved.