Illustrative road roller compacting a new asphalt road
TDA INFRACON · Pavement Works

Road Surfacing
& Pavement Works.

Discuss pavement correction, bituminous surfacing, surface preparation, and road marking requirements for your construction scope.

Surface Preparation to Finishing

A clear understanding
of every pavement layer.

Pavement work brings together preparation, specified materials, layer thicknesses, and compaction requirements. Each enquiry should identify the existing road conditions and the proposed construction scope.

Share your road surfacing requirements with TDA INFRACON to discuss the work limits, technical documents, resources, and coordination arrangements.

  • Scope discussions based on drawings and specifications
  • Defined requirements for pavement layers and surface treatments
  • Coordination of site activities and construction responsibilities
Illustrative road construction with paving machinery and trucks

Representative stock photograph.

Pavement Work Requirements

From correction layers
to road markings.

These activities appear in the supplied road work description and provide a basis for discussing project-specific requirements.

01

WBM Correction Work

Discuss Water Bound Macadam correction requirements, including the specified thickness and extent of work.

02

Dense Bituminous Macadam

Review the specified DBM layer, material requirements, quantities, and construction arrangements.

03

Bituminous Concrete

Discuss the proposed BC surfacing layer and the thickness and finishing requirements in the project scope.

04

Prime Coat & Tack Coat

Review the surface treatment requirements specified for the pavement construction package.

05

Laying & Compaction

Define the laying, equipment, and compaction requirements alongside the project specifications.

06

Thermoplastic Road Markings

Discuss marking layouts, quantities, and thermoplastic paint requirements for the defined scope.

Technical Scope Reference

Anini–Mipi Road
surfacing description.

The supplied work description concerns surfacing for improvement of riding quality on Anini–Mipi Road under Project Udayak in Arunachal Pradesh.

This section describes the supplied technical scope. The cropped extract does not establish TDA INFRACON’s contractual role, awarded value, or completion status for this work.

Specified Work Details

Road
Anini–Mipi
Location
Arunachal Pradesh
WBM correction
75 mm
DBM layer
50 mm thick, HMP mix
BC layer
30 mm thick compacted, HMP mix
Surface treatments
Prime coat and tack coat
Road marking
Thermoplastic paint
Specification cited
MORT&H, 5th revision
Prepare Your Enquiry

Share the information
behind your pavement scope.

Clear technical and site information helps define the discussion and identify the documents needed to assess the proposed work.

01 / SITE

Location & Road Condition

Road name, chainage, access information, and available details of the existing surface.

02 / DESIGN

Layers & Specifications

Proposed pavement layers, thicknesses, materials, drawings, and applicable specifications.

03 / QUANTITIES

Work Limits & Quantities

Length, width, layer quantities, treatment areas, and marking requirements.

04 / COORDINATION

Timeline & Responsibilities

Proposed programme, site arrangements, work responsibilities, and commercial expectations.

Helpful Information

Pavement work enquiries.

A few useful points before discussing your surfacing and pavement requirements.

What pavement activities can I discuss?

You can share requirements for WBM correction, DBM and BC layers, prime coat, tack coat, laying and compaction, and thermoplastic road markings. Project suitability and responsibilities should be discussed with the team.

What do DBM and BC mean?

DBM means Dense Bituminous Macadam. BC means Bituminous Concrete. Both terms appear in the supplied road surfacing description.

Are the layer thicknesses the same for every project?

No. The thicknesses shown here belong to the supplied Anini–Mipi scope. Your project requirements must follow its approved design and specifications.

What documents should I provide?

Share available drawings, pavement specifications, quantities, work limits, road condition information, and the proposed construction programme.

Are these actual company project photographs?

The page uses representative stock photography. Actual project images can replace them when available.

Let’s discuss your pavement requirements.

Share your project location, technical scope, and construction requirements with TDA INFRACON.

P No. 43 A/5, Flat AR No. 2C,
T S 8814, Vadawali Sect,
Ambernath, Maharashtra – 421501.

Call: +91 98107 76177

Start a Project Enquiry